Virgin Islands Water & Power Authority

State power authorityU.S. Virgin IslandsWebsite ↗

Customers (2025)
54,204
Meters
54,204
Smart meters (AMI)
53,324 (98%)
Grid region
VI
EIA utility number
19879

Counts: EIA Form 861, data year 2025.

Meters installed

Itron, Inc.· Itron cellular (OpenWay CENTRON Cellular LTE-M, Itron Cellular modules)Rolling out

Cellular · since 2026 [source]

WAPA board approved a four-year, $30M Itron contract (2025-02-27) to replace the failed AMI: meters with SIM cards, carrier-independent cellular, internal temperature sensors rated to 85 C; St. John pilot; Witt O'Brien's manages the project. May 2026: go-live targeted 2026-08-31, installs from St. John with St. Thomas and St. Croix, continuing into September 2026. Meter model not stated (board mentioned Gen 5). Re-checked 2026-11-16: no report found on whether the 2026-08-31 go-live happened (looked: VI Consortium, St. Thomas Source; Source reports the board chose concurrent St. Thomas and St. Croix installs, Christiansted to Frederiksted routes); status stays in_progress.

Tantalus Systems· Tantalus TUNet· meters by Itron, Inc.Current

Tower-based RF · since 2014 [source]

Models: CENTRON II

Tantalus 2014-03-05: VIWAPA selected Itron and Tantalus for AMI covering 55,000+ electric customers on St. Croix, St. John and St. Thomas: TUNet-enabled Itron CENTRON II meters, existing fiber and microwave backhaul. The system failed (meter capacitor degradation, thermal management); WAPA awarded Itron a replacement contract in 2025. Kept current until the replacement is confirmed.

Getting your usage data

Green Button
Not stated
Pair a device to the meter
Not stated
Meter radio readable with an SDR
No
Smart meter opt-out
Not stated
Research
Researched [source]

Website not fetched (domain from general knowledge, verify). No customer usage portal found. Original Itron/Tantalus AMI (2014-) failed (meter capacitor degradation, thermal problems; putative class action); replacement Itron cellular AMI targeted to go live 2026-08-31 with installs from St. John into September 2026 (VI Consortium 2026-05-14); completion not confirmed. ert_broadcast no = TUNet / cellular AMI (inferred).

Meter types over time

0%50%100%2015: AMI 77%, AMR 0% of 68,892 meters'152016: AMI 93%, AMR 0% of 60,599 meters'162017: AMI 93%, AMR 0% of 60,599 meters'172018: AMI 99%, AMR 0% of 56,450 meters'182019: AMI 99%, AMR 0% of 56,133 meters'192020: AMI 99%, AMR 0% of 56,133 meters'202021: AMI 100%, AMR 0% of 56,307 meters'212022: AMI 97%, AMR 0% of 55,666 meters'222023: AMI 100%, AMR 0% of 54,432 meters'232024: AMI 98%, AMR 0% of 54,457 meters'242025: AMI 98%, AMR 0% of 54,204 meters'25
AMI (two-way smart meters)AMR (one-way radio reads)Other metersVirgin Islands Water & Power Authority. Source: EIA Form 861.

Counties served

U.S. Virgin Islands: St Croix, St John, St Thomas

EIA lists a county when the utility serves any part of it.

Get live readings from your own meter

We are building Utility Brain, a small receiver that reads your electric meter the way your utility does and shows your usage minute by minute. Join the list and we'll tell you when it works with your meter.

We only use this to tell you about Utility Brain. Privacy.