Virgin Islands Water & Power Authority
State power authorityU.S. Virgin IslandsWebsite ↗
- Customers (2025)
- 54,204
- Meters
- 54,204
- Smart meters (AMI)
- 53,324 (98%)
- Grid region
- VI
- EIA utility number
- 19879
Counts: EIA Form 861, data year 2025.
Meters installed
Itron, Inc.· Itron cellular (OpenWay CENTRON Cellular LTE-M, Itron Cellular modules)Rolling out
Cellular · since 2026 [source]
WAPA board approved a four-year, $30M Itron contract (2025-02-27) to replace the failed AMI: meters with SIM cards, carrier-independent cellular, internal temperature sensors rated to 85 C; St. John pilot; Witt O'Brien's manages the project. May 2026: go-live targeted 2026-08-31, installs from St. John with St. Thomas and St. Croix, continuing into September 2026. Meter model not stated (board mentioned Gen 5). Re-checked 2026-11-16: no report found on whether the 2026-08-31 go-live happened (looked: VI Consortium, St. Thomas Source; Source reports the board chose concurrent St. Thomas and St. Croix installs, Christiansted to Frederiksted routes); status stays in_progress.
Tantalus Systems· Tantalus TUNet· meters by Itron, Inc.Current
Tower-based RF · since 2014 [source]
Models: CENTRON II
Tantalus 2014-03-05: VIWAPA selected Itron and Tantalus for AMI covering 55,000+ electric customers on St. Croix, St. John and St. Thomas: TUNet-enabled Itron CENTRON II meters, existing fiber and microwave backhaul. The system failed (meter capacitor degradation, thermal management); WAPA awarded Itron a replacement contract in 2025. Kept current until the replacement is confirmed.
Getting your usage data
- Green Button
- Not stated
- Pair a device to the meter
- Not stated
- Meter radio readable with an SDR
- No
- Smart meter opt-out
- Not stated
- Research
- Researched [source]
Website not fetched (domain from general knowledge, verify). No customer usage portal found. Original Itron/Tantalus AMI (2014-) failed (meter capacitor degradation, thermal problems; putative class action); replacement Itron cellular AMI targeted to go live 2026-08-31 with installs from St. John into September 2026 (VI Consortium 2026-05-14); completion not confirmed. ert_broadcast no = TUNet / cellular AMI (inferred).
Meter types over time
Counties served
U.S. Virgin Islands: St Croix, St John, St Thomas
EIA lists a county when the utility serves any part of it.