Pedernales Electric Coop, Inc
Electric cooperativeTexasWebsite ↗
- Customers (2025)
- 474,954
- Meters
- 474,954
- Smart meters (AMI)
- 474,638 (100%)
- Customers with daily online usage
- 474,954
- Grid region
- TRE · ERCOT
- EIA utility number
- 14626
Counts: EIA Form 861, data year 2025.
Meters installed
Aclara Technologies· Aclara RF (AclaraONE head-end)· meters by Aclara TechnologiesCurrent
Tower-based RF · since 2020 · Part of the territory [source]
Aclara RF point-to-multipoint (450-470 MHz per PEC notice) for the eastern region incl. parts of Austin, more than 350,000 endpoints on the head-end; Aclara also supplies meters replacing electro-mechanical meters; installer Allegiant Utility Services. Contract July 2020. Nectar Climate (secondary) says the AMI rollout started May 2024.
Aclara Technologies· Aclara TWACS / eTWACS power line carrierCurrent
Power line carrier · Part of the territory [source]
Aclara 2020 release: PEC runs a hybrid system, Aclara TWACS PLC in the western region and Aclara RF in the eastern region, on one AclaraONE head-end. TWACS start year not found (EIA reported PEC meters as AMR through 2016).
Getting your usage data
- Online account
- pec.smarthub.coop
- Interval you can see
- Hourly
- Interval the utility collects
- 15 minutes
- Green Button
- Not stated
- Pair a device to the meter
- Not stated
- Meter radio readable with an SDR
- No
- Smart meter opt-out
- Allowed, with a fee ($200)
- Research
- Researched [source]
NISC SmartHub Usage Explorer: daily and hourly, 15-minute 'if available' per PEC; Nectar Climate (secondary) says export is hourly-only since Jan 2024 and no Green Button. Opt-out (Advanced Metering Opt Out Program): $75 meter exchange plus $30/month + $1/mile manual reading, from a copy of PEC's rates and fees (check the June 2025 Tariff and Business Rules). ert no = Aclara TWACS/RF meters (inferred). Corrected 2026-11-16: PEC Tariff and Business Rules (eff. 2026-10-01, fetched) sec. 300.13.6 / 500.8: Advanced Metering Opt-Out meter exchange fee $200 per meter, $30/month processing fee per meter plus $3.50/mile trip charge, $200 opt-out disconnect/reconnect fee (the $75 / $1-mile figures were an older schedule). Usage intervals per PEC Usage Explorer post (mypec.com/peek-under-the-hood-with-usage-explorer/).
Meter types over time
Counties served
Texas: Bell, Bexar, Blanco, Burnet, Caldwell, Comal, Edwards, Gillespie, Guadalupe, Hays, Kendall, Kerr, Kimble, Kinney, Lampasas, Llano, Mason, Menard, Real, San Saba, Schleicher, Sutton, Travis, Williamson
EIA lists a county when the utility serves any part of it.
Get live readings from your own meter
We are building Utility Brain, a small receiver that reads your electric meter the way your utility does and shows your usage minute by minute. Join the list and we'll tell you when it works with your meter.