CenterPoint Energy
Investor-owned utilityTexasWebsite ↗
- Customers (2025)
- 2,874,942
- Meters
- 2,874,942
- Smart meters (AMI)
- 2,863,803 (100%)
- Radio-read meters (AMR)
- 10,992 (0%)
- Grid region
- TRE · ERCOT
- EIA utility number
- 8901
Counts: EIA Form 861, data year 2025.
Meters installed
Itron, Inc.· Itron network Gen4/Gen5/Gen6 (Silver Spring mesh heritage, UtilityIQ)Rolling out
RF mesh · 2026–2026 · 10,000 meters · Part of the territory [source, unverified]
Models: Gen5 Riva (G5R1)
CenterPoint market notice dated 2025-12-02: upgrade of 10,000 advanced meters in the Galveston Island area to Itron Gen5 Riva meters, March to September 2026, under its PUC-approved AMS Deployment Plan. Seen via search result; the notice URL returned 404 on fetch. No system-wide replacement found. Re-checked 2026-11-16: search snippet of the CenterPoint notice itself repeats 10,000 Galveston Island meters to Itron Gen5 Riva, March to est. September 2026 (multi-family and hard-to-reach first); PDF still 404 on fetch; no completion report found.
Itron, Inc.· Itron OpenWay (CG-Mesh IPv6, with Cisco)Current
RF mesh · 2009–2012 · 2,200,000 meters [source]
Models: OpenWay CENTRON
CenterPoint Houston Electric AMS (PUC approved Dec 2008): Itron OpenWay CENTRON meters, first meter March 2009, 10,000-meter OpenWay field test from Nov 2006; Itron announced 2.2 million installed on 2012-09-28 with 15-minute data on Smart Meter Texas. Facts via search results of the Itron release. Verified 2026-11-16: Itron release of 2012-09-28 (fetched) confirms more than 2.2 million Itron smart meters installed and 15-minute data on Smart Meter Texas; OpenWay model and March 2009 start from T&D World / Utility Dive snippets.
Getting your usage data
- Online account
- www.smartmetertexas.com
- Interval you can see
- 15 minutes
- Available
- Next day
- Green Button
- Not stated
- Apps that can connect
- Smart Meter Texas
- Pair a device to the meter
- Discontinued
- Meter radio readable with an SDR
- No
- Smart meter opt-out
- Allowed, with a fee ($200)
- Research
- Researched [source]
Usage on Smart Meter Texas (15-minute). Non-standard metering (tariff sheet 6.15, rev. 13 eff. 2025-04-28): one-time $200 advanced meter with communications disabled, $210 new analog, $220 digital non-communicating, $93 to keep an existing analog meter; monthly $51. ert no = OpenWay / Gen5 Riva (inferred). HAN: Smart Meter Texas removed its In-Home Device provisioning on 2019-12-07; devices paired before then stay supported by the TDU (forum report, verify); 16 TAC 25.130(g)(1)(J) as amended 2020 limits the HAN duty to devices already paired and in use. Verified 2026-11-16: fees from the CenterPoint tariff (primary); 15-minute SMT access confirmed by the Itron/CenterPoint 2012 release; SMT HAN cut-off date still only from forum reposts.
- Pair a Zigbee energy monitor →
- About Green Button →
- Read the meter's test LED →
- Texas data access rules →
Meter types over time
Counties served
Texas: Austin, Brazoria, Chambers, Colorado, Fort Bend, Galveston, Harris, Liberty, Matagorda, Montgomery, Waller, Wharton
EIA lists a county when the utility serves any part of it.
Get live readings from your own meter
We are building Utility Brain, a small receiver that reads your electric meter the way your utility does and shows your usage minute by minute. Join the list and we'll tell you when it works with your meter.