Puerto Rico Electric Pwr Authority
State power authorityPuerto RicoWebsite ↗
- Customers (2025)
- 1,516,976
- Meters
- 1,516,976
- Smart meters (AMI)
- 137,214 (9%)
- Radio-read meters (AMR)
- 1,368,526 (90%)
- Grid region
- PR
- EIA utility number
- 15497
Counts: EIA Form 861, data year 2025.
Meters installed
Itron, Inc.Rolling out
since 2025 · 1,500,000 meters [source]
LUMA (operator of PREPA's grid) selected Itron after an RFP published 2023-08-31 (FEMA-funded); about 1.5 million electric smart meters plus a new redundant communications network; first installs April 2025 (Nemesio Canales, San Juan), island-wide over about three years. Itron product line and network type not named. EIA 2025: 137,214 AMI.
Aclara Technologies· Aclara TWACS / eTWACS power line carrierCurrent
Power line carrier [source]
ESCO/DCSI release (T&D World, 2007-12-27): PREPA's fixed-network TWACS system had over one million endpoints; new ~$27M contract for about 300,000 more TWACS meter modules and substation equipment over 2.5 years to cover the rest of the territory. PREPA overview deck lists TWACS for AMR and connect/disconnect. DCSI became Aclara. EIA reports these as AMR (1.37M in 2025). Being replaced by the Itron AMI from 2025.
Echelon Corporation· Echelon NES power line AMI (Networked Energy Services)Current
Power line carrier · 30,000 meters · Part of the territory [source]
Models: MTR 5000 series ANSI smart meter
NES case study (vendor, English page, re-checked 2026-11-16): at Hurricane Maria (2017) PREPA had about 30,000 NES MTR 5000 ANSI smart meters (OSGP power-line) and 2,500+ control nodes in several cities; a 2018 NES release says PREPA chose NES for OSGP PLC with the Patagonia platform. Install years not stated. Model MTR 5000 not in catalog. Being superseded by the island-wide Itron AMI from 2025; whether the NES meters are still read is not stated. Catalog re-point 2026-11-16.
Getting your usage data
- Green Button
- Not stated
- Pair a device to the meter
- Not stated
- Meter radio readable with an SDR
- No
- Smart meter opt-out
- Not stated
- Research
- Partly researched [source]
Meters sourced (TWACS PLC, NES pilot, Itron AMI in progress); customer data access not found: LUMA announcements promise better usage information but name no portal interval, Green Button or opt-out (one Spanish search found nothing). EIA-861 utility is PREPA; LUMA Energy operates T&D and customer service since 2021.
Meter types over time
Counties served
Puerto Rico: Adjuntas, Aguada, Aguadilla, Aguas Buenas, Aibonito, Anasco, Arecibo, Arroyo, Barceloneta, Barranquitas, Bayamon, Cabo Rojo, Caguas, Camuy, Canovanas, Carolina, Catano, Cayey, Ceiba, Ciales, Cidra, Coamo, Comerio, Corozal, Culebra, Dorado, Fajardo, Florida, Guanica, Guayama, Guayanilla, Guaynabo, Gurabo, Hatillo, Hormigueros, Humacao, Isabela, Jayuya, Juana Diaz, Juncos, Lajas, Lares, Las Marias, Las Piedras, Loiza, Luquillo, Manati, Maricao, Maunabo, Mayaguez, Moca, Morovis, Naguabo, Naranjito, Orocovis, Patillas, Penuelas, Ponce, Quebradillas, Rincon, Rio Grande, Sabana Grande, Salinas, San German, San Juan, San Lorenzo, San Sebastian, Santa Isabel, Toa Alta, Toa Baja, Trujillo Alto, Utuado, Vega Alta, Vega Baja, Vieques, Villalba, Yabucoa, Yauco
EIA lists a county when the utility serves any part of it.
Get live readings from your own meter
We are building Utility Brain, a small receiver that reads your electric meter the way your utility does and shows your usage minute by minute. Join the list and we'll tell you when it works with your meter.