City of Park River - (ND)
Municipal utilityNorth DakotaWebsite ↗
- Customers (2025)
- 893
- Meters
- 842
- Smart meters (AMI)
- 0 (0%)
- Radio-read meters (AMR)
- 842 (100%)
- EIA utility number
- 14474
Counts: EIA Form 861, data year 2025 (short form: small utilities report customers but not meter types).
Meters installed
Eaton· Eaton RF smart grid networkRolling out
RF mesh · since 2024 [source, unverified]
Eaton (Cooper) auto-read AMI: gateways and relays set up with Eaton-Cooper reps (Dec 2023 minutes), Sandwood Addition trial Jan-Feb 2024, then Kensington Addition; ~40% installed by late 2024. RF mesh inferred from the gateway/relay architecture (same as the MRES Eaton service), not stated. Re-checked 2026-11-16: no source states Park River's network type (looked: MRES hosted AMI page, Hillsboro/Park River AMI search).
Getting your usage data
- Research
- Researched [source]
City of Park River. 2023-2024 council minutes: Eaton-Cooper auto-read meter system with gateways and relays (broadband fiber to relays), trial in Sandwood Addition early 2024, about 40% of electric meters installed later in 2024; 756 auto-read water nodes shipped; billing in Banyon. No usage portal found.
Meter types over time
Counties served
North Dakota: Walsh
EIA lists a county when the utility serves any part of it.
Get live readings from your own meter
We are building Utility Brain, a small receiver that reads your electric meter the way your utility does and shows your usage minute by minute. Join the list and we'll tell you when it works with your meter.