Utility Brain

Corn Belt Energy Corporation

Electric cooperativeIllinoisWebsite ↗

Customers (2025)
37,468
Meters
37,468
Smart meters (AMI)
0 (0%)
Radio-read meters (AMR)
37,468 (100%)
Grid region
RFC · MISO
EIA utility number
4362

Counts: EIA Form 861, data year 2025.

Meters installed

Landis+Gyr· Landis+Gyr Gridstream RF (Gridstream Connect RF mesh)Current

RF mesh · 2024–2024 [source, unverified]

Models: FOCUS AXR-SD

Illinois Country Living, May 2024 (Corn Belt page): AMI upgrade began early spring 2024, contractor meter change-outs from mid-May, all main meters to be replaced within about six months; fixed-network two-way system with daily and hourly data in SmartHub. Pictured meter faceplate reads 'FOCUS AXRe-SD ... CORN BELT ENERGY' (read from the photo), so Landis+Gyr FOCUS AXR-SD; Gridstream RF network inferred from the meter, not stated. Completion not confirmed (EIA 2024 still lists AMR). Re-checked 2026-11-16: Corn Belt 2024 annual report (search snippet) says the AMI project is well underway and expected to be complete within the next few months; no completion notice found (Sept 2024 and Dec 2025 Powerline read: no AMI items); no primary source names the network. Vendor rests on the faceplate photo.

Vendor not knownReplaced

[source, unverified]

Meters in place before the 2024 AMI upgrade, which replaces all main meters; vendor and technology of the old system not stated in the co-op's notice. Re-checked 2026-11-16: no primary source found for the pre-2024 meter system (looked: Corn Belt Powerline 2024-2025, ICL archive search).

Getting your usage data

Online account
cornbeltenergy.smarthub.coop
Interval you can see
Hourly
Available
Next day
Green Button
Not stated
Pair a device to the meter
Not stated
Meter radio readable with an SDR
No
Smart meter opt-out
Not stated
Research
Researched [source]

Usage Concerns page: log in to SmartHub to view hourly, daily and monthly use with temperature data. Latency assumed next-day (NISC SmartHub norm, not stated). Landis+Gyr FOCUS AXR-SD on Gridstream RF (inferred): not ERT.

Meter types over time

0%50%100%2013: AMI 0%, AMR 100% of 34,844 meters'132014: AMI 0%, AMR 100% of 35,195 meters'142015: AMI 0%, AMR 100% of 35,431 meters'152016: AMI 0%, AMR 100% of 35,674 meters'162017: AMI 0%, AMR 100% of 35,887 meters'172018: AMI 0%, AMR 100% of 36,015 meters'182019: AMI 0%, AMR 100% of 36,195 meters'192020: AMI 0%, AMR 100% of 36,395 meters'202021: AMI 0%, AMR 100% of 36,576 meters'212022: AMI 0%, AMR 100% of 36,807 meters'222023: AMI 0%, AMR 100% of 36,995 meters'232024: AMI 0%, AMR 100% of 37,183 meters'242025: AMI 0%, AMR 100% of 37,468 meters'25
AMI (two-way smart meters)AMR (one-way radio reads)Other metersCorn Belt Energy Corporation. Source: EIA Form 861.

Counties served

Illinois: Bureau, Champaign, DeWitt, Ford, Henry, Kendall, Knox, LaSalle, Livingston, Logan, Macon, Marshall, McLean, Piatt, Putnam, Stark, Tazewell, Woodford

EIA lists a county when the utility serves any part of it.

Get live readings from your own meter

We are building Utility Brain, a small receiver that reads your electric meter the way your utility does and shows your usage minute by minute. Join the list and we'll tell you when it works with your meter.

We only use this to tell you about Utility Brain. Privacy.