City of Estherville - (IA)
Municipal utilityIowaWebsite ↗
- Customers (2025)
- 3,426
- EIA utility number
- 5998
Counts: EIA Form 861, data year 2025 (short form: small utilities report customers but not meter types).
Meters installed
Tantalus SystemsPlanned
since 2026 [source]
DOE Build America, Buy America nonavailability waiver 2026-03 (final; text read 2026-11-16): IIJA grid resilience formula grant (DE-FOA-0002736) via the Iowa Economic Development Authority, sub-recipient City of Estherville; project cost $1,800,002, waived AMI products $824,050; covered items residential single-phase and polyphase electric meters, load management devices and base station/collectors; waiver runs through the project performance period (until December 2027). Vendor and model not named; start_year is the waiver year, not an install date. KUOO/Explore Okoboji (2026-04-23, read 2026-11-16): Estherville city council approved an agreement with Tantalus, Inc. for a grid management, monitoring and control project ($1.8M, $1.4M grant) including remote meter reading; the city administrator says all electric meters in town will be replaced with smart meters, and the system will also read the water meters. Install progress not found.
Getting your usage data
- Green Button
- Not stated
- Pair a device to the meter
- Not stated
- Meter radio readable with an SDR
- Not stated
- Smart meter opt-out
- Not stated
- Research
- Partly researched [source, unverified]
City of Estherville electric (about 3,200 accounts). An undated city lineworker posting lists meter reading among duties (manual reads likely); April 2026 news on distribution improvements gives no metering detail. EIA reported only standard meters through 2019. Searched with name + Iowa + AMI/AMR/smart meter/portal terms; results were only directory listings and the IAMU SGIG project (which does not list it). Added 2026-11-14: planned AMI under DOE BABA waiver 2026-03 (see deployments). Re-checked 2026-11-16: DOE BABA waiver 2026-03 text read (AMI meters, load management devices and collectors, project through Dec 2027); no portal or vendor named. Tantalus agreement approved April 2026 (KUOO); possible future time-of-day rates mentioned; no portal yet.
Meter types over time
Counties served
Iowa: Emmet
EIA lists a county when the utility serves any part of it.
Get live readings from your own meter
We are building Utility Brain, a small receiver that reads your electric meter the way your utility does and shows your usage minute by minute. Join the list and we'll tell you when it works with your meter.