Utility Brain

City of Longmont

Municipal utilityColoradoWebsite ↗

Customers (2025)
44,390
Meters
49,487
Smart meters (AMI)
49,151 (99%)
Grid region
WECC
EIA utility number
11187

Counts: EIA Form 861, data year 2025.

Meters installed

Landis+Gyr· Landis+Gyr Gridstream RF (Gridstream Connect RF mesh)Current

RF mesh · 2023–2024 · 49,000 meters [source]

Landis+Gyr contract (2022): Gridstream Connect IoT platform with Revelo meters (Revelo model not stated, model_ids blank); installation by Aclara; ~$14M. City AMI page: meters send hourly to collectors wired to NextLight fiber. Citywide installs from Aug 2023; PRPA directors report 8/2024: 34,000 installed, all 49,000 expected by Dec 2024. Earlier AMR (EIA 2023: 20,161 AMR) vendor not found. Verified 2026-11-16: T&D World 2022-01-21 (fetched) confirms Landis+Gyr Gridstream Connect IoT platform with Revelo advanced meters; it planned 500 meters from spring 2022 and about 46,000 by end of 2023 and names LPC as installer (the Aclara installer and 49,000 count come from later city/PRPA reports).

Getting your usage data

Online account
myutilityaccount.longmontcolorado.gov
Interval the utility collects
Hourly
Green Button
Connect My Data connect
Pair a device to the meter
Not stated
Meter radio readable with an SDR
No
Smart meter opt-out
Allowed, with a fee ($15)
Research
Researched [source, unverified]

MyUtilityAccount shows electric and water usage history (Utility Bill FAQs). New customer portal launched 2024-08-22 with Cayenta CIS (PRPA report). Green Button CMD sharing portal at benchmarking.longmontcolorado.gov (UtilityAPI-powered) per Nectar Climate snippet; the site failed to load (self-signed cert), so third_party_api left blank. Opt-out: city page = one-time manual-meter install cost + monthly charge; Longmont Leader: $15/month plus $50 (or $125 in 2020 reporting) one-time; fee is the monthly amount. ert_broadcast no = Gridstream RF. Re-checked 2026-11-16: city AMI page (fetched) confirms meters transmit for under a second every hour and the opt-out = one-time manual-meter install cost + monthly charge (amounts not on the page). Longmont Leader (snippets): $50 one-time if opting out before the swap, $125 after the two-week window, $15/month. CMD portal still unread.

Meter types over time

0%50%100%2013: AMI 0%, AMR 10% of 40,270 meters'132014: AMI 0%, AMR 12% of 40,798 meters'142015: AMI 0%, AMR 14% of 41,155 meters'152016: AMI 0%, AMR 17% of 41,720 meters'162017: AMI 0%, AMR 21% of 42,846 meters'172018: AMI 0%, AMR 23% of 44,000 meters'182019: AMI 0%, AMR 26% of 45,080 meters'192020: AMI 0%, AMR 28% of 45,669 meters'202021: AMI 0%, AMR 30% of 46,257 meters'212022: AMI 0%, AMR 33% of 46,579 meters'222023: AMI 0%, AMR 42% of 47,548 meters'232024: AMI 98%, AMR 2% of 48,499 meters'242025: AMI 99%, AMR 0% of 49,487 meters'25
AMI (two-way smart meters)AMR (one-way radio reads)Other metersCity of Longmont. Source: EIA Form 861.

Counties served

Colorado: Boulder, Weld

EIA lists a county when the utility serves any part of it.

Get live readings from your own meter

We are building Utility Brain, a small receiver that reads your electric meter the way your utility does and shows your usage minute by minute. Join the list and we'll tell you when it works with your meter.

We only use this to tell you about Utility Brain. Privacy.